Referans listesine dön

Sun InBev Ukraine - Desna

Ülke Desna / Ukrayna
Sistem konfigürasyonu Anahtar Teslimi Proje
Yapilan Faaliyet Building BTS plant for Sun InBev Desna as a Turnkey Project. The capacity is 7.175 m3/day flowrate. Biogas will be utilized at the existing boiler of the plant and green energy will be gained as an Output of BTS
Tarih 2011-2012